What is a Chapter 558 notice of claim for a construction defect in Florida?
Under Florida Statute 558.004, a homeowner alleging a construction defect must serve a written notice of claim at least 60 days before filing an action, giving the builder or contractor a chance to inspect and respond.
If you own a newer home in Brevard County, or you are buying one, you may hear the phrase "Chapter 558" in connection with a builder, a roofer, or a remodeler. It is Florida's pre-suit process for construction defect claims, and it sets a clear order of events with real deadlines.
This guide walks through the timeline in plain language for Space Coast owners in Viera, Melbourne, Merritt Island, Rockledge, and Cocoa Beach. I am a Realtor, not an attorney, so use this to prepare questions for a Florida construction attorney.
What does Florida Statute 558.004 require before a lawsuit?
In actions alleging a construction defect, Florida Statute 558.004 says the claimant must serve written notice of claim on the contractor, subcontractor, supplier, or design professional at least 60 days before filing any action. For an action involving an association that represents more than 20 parcels, the notice must go out at least 120 days before filing.
The definitions that apply to the process, including what counts as a construction defect, are in Florida Statute 558.002. Read the definitions before you assume a problem qualifies.
What is the timeline once the notice is served?
| Step | Standard timing | Association with more than 20 parcels |
|---|---|---|
| Notice of claim served before filing | At least 60 days before filing | At least 120 days before filing |
| Inspection of the property by the party served | Within 30 days after service | Within 50 days after service |
| Written response to the claimant | Within 45 days after service | Within 75 days after service |
Those windows come straight from the statute. The inspection step is a right of the party served, so plan to give access to the home on a reasonable schedule.
Does sending the notice stop the clock on other deadlines?
No. The statute says a notice of claim served under the chapter does not toll any statute of repose period under chapter 95. That is a legal term for an outer time limit on bringing a claim, and it is one reason to talk with an attorney early instead of waiting to see whether a problem gets worse.
What should a Space Coast homeowner document first?
A clear paper trail makes every later step easier. Start a folder with these items:
- Your purchase contract, closing paperwork, and any builder warranty documents.
- Dated photos and short videos of the problem, with a tape measure or a coin for scale.
- Names of the contractor, subcontractors, and suppliers involved, and any permit numbers you can find through Brevard County or your city.
- Written communication with the builder or contractor, including dates of any repair visits.
Keep repair requests in writing, even if you also call. Written dates are easier to rely on later.
How is this different from a builder warranty?
A warranty is a promise in your contract or warranty booklet about what the builder will repair and for how long. Chapter 558 is a state process that comes before a lawsuit over a construction defect. They can overlap, so check your warranty terms first, and read our guide on new construction warranties in Viera and Melbourne for how those documents usually work.
What if you are buying a newer home with a known issue?
Ask the seller whether any notice of claim, repair demand, or dispute with a builder exists for the property. Put the question in writing through your Realtor and ask for any related paperwork. If a claim is pending, have your attorney review it before you sign.
Frequently Asked Questions
Does Chapter 558 apply to every home repair problem?
It applies to actions alleging a construction defect as the statute defines that term. Cosmetic wear and ordinary maintenance are different questions, so check the definitions in section 558.002 with your attorney.
Who gets the notice of claim?
The statute names the contractor, subcontractor, supplier, or design professional, as applicable. Your attorney can confirm who should be served in your situation.
Can I fix the problem and still use the process?
Ask your attorney before you repair anything, since the party served has a right to inspect the property after the notice. Photos taken before any work are important.
This post is general information, not legal advice. Talk with a Florida construction attorney about your specific situation.